New Build in Kildare. The Estate County.

80.1% of the 6,302 homes completed in Kildare between 2023–2025 were scheme houses, the highest share of any county we cover, spread across eight towns at once. The Kildare new-build customer is the estate buyer, so most of this page is for them.

Jamie CowmanRegistered Electrical Contractor, Safe Electric A6700

Eight towns, one kind of house

Nationally, 50.6% of new homes are scheme houses. In Kildare it is 80.1%, and unlike every other county we cover, no single town dominates: the building runs across eight centres at once, each taking more completions than most counties’ second town. One-offs are 8% here and apartments 11.9%, so the estate house is not one market among several in Kildare. It is the market.

WhereCompletions 2023–2025
Newbridge1,088
Kildare1,022
Naas1,002
Maynooth783
Clane775
Leixlip604
Athy546
Celbridge480

Source: CSO new dwelling completions by local electoral area, 2023–2025. Data pulled 2026-08-05.

Your electrical decisions close before the plaster does

In a scheme house the developer’s electrician wires to the scheme specification, and your influence is one list: the extras offered before first fix closes. That list is the cheapest moment your house will ever have for extra sockets, data points, outdoor power and EV provision, because the walls are open and the crew is already there. The same socket after handover is a chase, a plasterer and a painter.

So the advice is short and worth money: walk the plans with your furniture in mind before the extras deadline, put sockets where the beds and desks will really go, take EV conduit if it is offered regardless of what you drive today, and keep the Completion Certificate you receive at handover with the deeds. If the list itself looks steep, send it to us with the floor plan and we will tell you which items are worth the developer’s price and which are cheaper done after you move in.

The follow-on county: chargers, garden offices, capacity

Kildare has 10,389 homes built since 2011, a bigger share of the county than anywhere we cover except Meath, and they generate its most common work: additions to installations that are young and sound. A car charger on its own circuit, a garden office on a properly sized supply rather than an extension lead, extra sockets where the developer’s allowance ran thin. Nothing needs replacing; the board just needs ways and sometimes an upgrade to carry the new loads with RCBO and surge protection. The EV calculator prices a charger in two minutes, and the 2011-onward guide covers the capacity questions properly. For developers, the full package story, first fix to per-unit certification, is on the multi-unit page; for the county’s rare one-offs, the new build electrical page carries the walkthrough.

Why this job is safe with us

We deliver full electrical packages from first fix to final cert, including a 90-unit residential development in Dublin, certified unit by unit. The same crew and the same standard run a one-off house.

Safe Electric registered

Registration A6700

Verifiable on the public register

Public liability insurance

Up to €6.5M

Cover in place on every job

Crew size

10 electricians

Trading since 2021

Fixed-price quote

Within 48 hours

WhatsApp replies within the hour, Mon–Fri

Largest completed package

90-unit residential development, Dublin

Full electrical package, first fix to completion · Completed 2026

More about the business · Completed work

Kildare new build: what we get asked

We are buying in a new Kildare estate. What electrical decisions do we actually get to make?

Fewer than you might expect, and they close early. The developer's electrician wires every unit to the scheme specification, and your influence is the extras list offered before first fix: additional sockets, TV and data points, outdoor power, sometimes EV provision. Once the plaster is on, each of those becomes a chase-and-make-good job at a multiple of the pre-plaster price. So treat the extras deadline as the real decision point: walk the plans with the furniture in mind, put sockets where the beds and desks will actually go, and take the EV conduit if it is offered at all.

The developer's extras list seems expensive. Should we just add things after we move in?

Compare like with like before deciding. An extra double socket on the extras list is priced with the walls open; the same socket afterwards involves chasing, plastering and paint, so the gap is usually smaller than it looks once the making good is counted. Data points and EV conduit lean strongly toward doing at build stage, because the routes close when the plaster goes on. Simple additions in accessible locations, a garden room supply, outdoor power off an external wall, price reasonably after handover. If you send us the extras list and the floor plan we will tell you honestly which items are worth the developer's price and which are cheaper later.

What should we receive at handover, electrically?

The Completion Certificate for your unit, and it matters more than most of the handover folder. It is the legally required record that the installation was done and tested by a Registered Electrical Contractor, your solicitor will want it when you sell, and any electrician altering the installation later should ask to see it. Keep it with the deeds. If you have bought and cannot find it, ask the builder or their electrical contractor for a copy sooner rather than later, while the paper trail is warm.

We moved in last year and want a car charger and a garden office. Is that a problem?

No, it is the most normal follow-on work in this county, and Kildare generates more of it than anywhere we cover: 10,389 homes here were built since 2011. Nothing in your installation is degrading. The questions are capacity ones: whether the board has spare ways, whether the supply carries the charger comfortably alongside the shower and the hob, and whether load management is needed. A charger takes its own circuit; a garden office takes a properly sized sub-circuit or small sub-board, not an extension lead. Both are quoted fixed, and additions are certified like any other work. One note: if the house is inside the builder's defects period, tell the builder in writing before the installation is altered.

Do you wire for developers in Kildare?

Yes. Scheme work is our core trade: full electrical packages from first fix to per-unit Completion Certificates, run against the build programme so the electrical never holds the plasterer or the painter. Our largest completed project is a 90-unit residential development, certified unit by unit at handover. Kildare's schemes are spread across eight towns rather than one, which suits how we work: consistent crew, fixed price from the drawings, and documentation that is ready when the assigned certifier compiles the compliance file rather than reconstructed at the end.

And if we are building a one-off in Kildare?

Then you are the county's exception, 8% of completions, and the job is the standard one-off package: ESB Networks connection applied for early, meter cabinet position decided at the site entrance, ducting in with the groundworks, first fix before plaster, second fix after decoration, testing and certification at the end. Size the board for a heat pump and a charger from day one, because every new dwelling is built to the near-zero-energy standard now. The full walkthrough, including what a rural site adds, lives on the new build electrical page, and we quote it fixed off your drawings.

How do you price new-build work?

Fixed, off the drawings, within 48 hours. For a developer that is the full package price against the programme. For a homeowner it is the same discipline at smaller scale: a written fixed price for the charger, the garden office, or the extras the developer would not do. Changes are priced and agreed in writing before they happen. The reason we can hold a fixed price is that we price the drawings rather than guess at them, and on estate stock the drawings are usually accurate.

Written and checked by

Jamie Cowman, Registered Electrical Contractor

Jamie runs J Cowman Electrical Contractors and holds Safe Electric registration A6700, which is what allows a Completion Certificate to be issued on this kind of work. Everything on this page reflects how the job is actually priced and sequenced on site, not a generic specification.

· About the business

From a Single Rewire to Full Developments: Send Us the Details.

Send us your plans or a quick description. We return a fixed-price quote within 48 hours, no obligation, no sales calls.